Skanska is a world leading project development and construction company. With 135 years of experience, Skanska's projects include offices, schools, roads, bridges, railways and stations across select markets in the Nordics, Europe and the United States. Skanska is delivering a £679 million improvement project on the A428 in Cambridgeshire to bring a new 10-mile dual carriageway between the Black Cat and Caxton Gibbet roundabouts.

The CostOS Advantage

Benefits of CostOS Application on A428

Discover how Skanska's pre-construction team applied CostOS to optimize the A428 Improvement Project. Delve into a comprehensive overview detailing the project's scope and explore the significant advantages gained through CostOS implementation paving the way for successful project delivery.

Advantages That CostOS Estimating Brings to Skanska

  • The use of BIM take-off ensures precise modeling, leading to a refined and mature project design.
  • Reliable and precise cost estimates offer high cost certainty, maintaining the project's financial health and budget.
  • Detailed cost breakdowns provide confidence in procurement decisions, ensuring timely and cost-effective processes.
  • Accurate cost estimating fosters trust and agreement on pricing with the client, establishing a solid collaborative foundation.
  • Transparency is achieved through up-to-date information sharing, fostering trust and engagement among stakeholders.

Explore their perspective

Complete Case Study

Gain insights into our client’s experiences, challenges, and the exceptional results they've achieved by partnering with us. 
Explore their perspectives and learn how Nomitech has become their trusted ally in transforming their businesses.

Scope of Work

The project involves a number of junction improvements, including several new bridges spanning the carriageway and river, a new three-tier junction at Black Cat roundabout to allow free flowing traffic onto the A1 and the new dual carriageway. The scheme includes safe crossing points for walkers, cyclists and horse riders, and reconnections for disrupted rights of way.

A428 Black Cat to Caxton Gibbet Improvements Scheme:

  • 19 km new dual carriage way road (offline and online)​
  • 3-tier fly over with ellipse shape round abouts​
  • 18 bridges (steel and precast structures)​
  • 23 minor culverts (include those with mammal pass)​
  • 650,000 m2 bituminous tarmacadam surface course​
  • 2.5 million m3 of material required (Cl2 and Cl6)​
A428Black Cat – Caxton Gibbet Improvement
United Kingdom
Junction Improvement CGI
3D Federated Model

Application of CostOS

CostOS became a vital tool in facilitating progressive technical reviews and ensuring rigorous project assurance. It also played a key role in enhancing coordination and integration across the project team (e.g., client, supply chain, designers). This was accomplished by establishing and maintaining a high level of integration (over 90%) between the Bill of Quantities and the work-in-progress BIM model (updated bi-weekly), ensuring the entire project team had access to a live narrative of the developing design. As a result, the team was able to design within budget constraints by continuously monitoring and evaluating the impact of changes, enabling early decision-making and proactive mitigation. The successful implementation of this strategy was driven by the adoption of the highways method of measurement as the common language to communicate emerging solutions, including design, construction methodology, and procurement.

  • BIM Take-off​: Ensured accuracy in quantity estimations and aided in better project planning and resource allocation. With CostOS, the BIM take-off process is streamlined, reducing manual errors and improving efficiency, resulting in a more accurate and reliable foundation for project cost estimating, helping to keep the project on budget and on schedule.
  • Detailed Cost Estimates: Created detailed cost estimates and generated precise cost predictions with a level of detail and flexibility ensuring that the project remains financially viable and within budget constraints.
  • Version Control: Robust version control features track and manage changes in project estimates and plans. This ensures that all stakeholders have access to the latest information, reducing the risk of discrepancies and miscommunications. Version control allows for the comparison of different versions of estimates, providing transparency and accountability.
The Process
Screenshots of CostOS application on A428 Improvement Project

Benefits & Achievements

  • Enhanced Design Maturity
  • Procurement Confidence
  • Client-Agreed Pricing
  • High Cost Certainty
  • Comprehensive Change Traceability
  • Full Project Transparency